Projects

The range and diversity of the projects we engage with reflects the nature and size of the challenges we all meet on the route to net-zero.

APRENCO – Appropriate Energy Company

Bringing together all of our project partners in an organised and timely manner ensures on-time and in-budget completion. Early and accurate completion and commissioning allows clients to take full operational advantage of their new systems.

Tawazon Group (ENTAG & ECARU)

Compost maturing at the Sandoub facility

Working between Cairo (Obour City), Al Mansour, Al Manzalah and Agga, Aprenco offered support and assistance with installed equipment, warranty issues, sourcing equipment and spares from international suppiers and contributed to the preparation of tenders for the MENA region.

Jöst GmbH & Co

Jöst Zig-Zag Windshifter at Al Manzalah (أل منزله )

Aprenco provided local support for the suppliers, Bollegraaf, EuRec and Jöst assisting the ENTAG engineering technicians with finding answers to questions arising from the waste being processed.

Bollegraaf and Lubo Recycling Solutions

Lubo Anti-Wrap Starscreen – AWS330 – at Sandoub (معنية سندوب, أل منصور)

The Sandoub facility is our largest MRF built to date (2023.) APRENCO provided operational and maintenance training for staff and management as well as after-sales service and liaison with the Governorate, end-user and suppliers.

EuRec Recycling Technology GmbH

EuRec Primary Shredder at Shebin-el-Koum (شبين الكوم)

APRENCO provided training for the local installation technicians as well as operational and maintenance training for the end-users’ staff and management. An important role was maintaining a clear interface for the Governorate, installers, operators and other stakeholders.

Hurghada Environmental Protection and Conservation Agency

Installation of a Lubo Elliptical Screen at the HEPCA MRF in Hurghada (الغردقة)

HEPCA provide waste management for the city and hotels serving the tourist industry. The intention is to reduce waste reaching the Red Sea and damaging the fragile ecosystems. APRENCO provided operational and maintenance training for staff and management.

Ingenieurbüro-Kühlerbau-Neustadt GmbH

Worked on developing a World Class Health and Safety programme and to assist with the companies plans to use more sustainable fuels, notably waste derived products, so that customers (cement companies) could reduce their reliance on fossil fuels.

TAIM WESER S.A.

Installation of canalettas for TaimWeser at Basildon MBT, Essex.

Site Manager, Health and Safety services and Project Management and liaison between international suppliers, client and customer. The project was to build a MBT capable of processing up to 1 million tons of MSW a year, recovering recyclables and producing a compost-like-output for landfill cover and remediation.

AmeyCespa Ltd (Thalia Waste Management)

TaimWeser Rotopala in the Bio-halls at Waterbeach, Cambs.

Site Manager, Health and Safety services and Project Management and liaison between international suppliers, client and customer. The project was the refurbishment and updating of a large MBT for AmeyCespa on behalf of Cambridgeshire CC.

Resíduos de Construção e Demolição S.A.

Resíduos de Construção e Demolição (RCD) Ferreira-a-Nova, Portugal

Project Manager and Site Manager overseeing construction and installation of first specialised C & D MRF in Portugal. Task needed management of on-time delivery of components from multiple suppliers and the training of staff and management in operations, maintenance and safety.

Redox Recycling (Colubris Cleantech B.V.)

Windshifters by Redox (Colubris Cleantech) Sunderland, Tyne & Wear

Led the design, construction and operational teams, sourcing suppliers and project managed the £4.5m construction. Managed the plant, developed staff training, maintenance procedures and SWP’s and developed novel markets in Europe and the far East for plastics, WEEE and other recovered materials.